Rainwater flowing into a street storm drain along a curb, illustrating the kind of stormwater infrastructure PWD's green infrastructure projects are designed to manage

PWD Infrastructure Projects Underway in Walnut Hill and Spruce Hill

The Philadelphia Water Department (PWD) is planning and designing several infrastructure projects in and around Walnut Hill and neighboring Spruce Hill, including new water mains, sewer replacements, and green stormwater infrastructure. The projects are at various stages, from design to pre-construction, and PWD will post construction dates and affected streets on each project page as work gets closer.


Residents can follow each project’s progress, view maps, and find contact information for the PWD Community Outreach Team at the links below:

Questions about any of these projects can be directed to the PWD Community Outreach Team at water.projects@phila.gov, referencing the project name, number, and ZIP code.